Day 128 | Porch wood delivery and building the porch

House Day: 128, 131
Loan Day: 145, 148

Tony's brother Dan came by in the morning and delivered the treated wood for the porch to be built. 




While they were building the porch on Monday, we had the roll off container dropped off for all the scraps. We have framing scraps still, will be using this for drywall scraps, and also siding scraps next week when they start that.



Siding and soffit was delivered on Monday morning too. 

Framing of the deck is looking really nice!











Just about complete!






Getting dark out, but here is the start of the framing of the bak porch decking. This is off our two story great room, the windows on the left is our master bedroom.



Thursday, October 08, 2015

Day 127 | Drywall delivered


House Day: 127
Loan Day: 144

We are scheduled to have our building inspector come out Friday and do the rough in inspection and then they are ready to start drywall on Monday!









Some foam insulation in the attic space in Brady's room, they must have came in and did that today too.










Thursday, October 01, 2015

Day 120 | Insulation has started


House Day: 120
Loan Day: 137

Blown in cellulose is what we are having done in the house. We swept the floors the day before so that they could vacuum up any that fell and still reuse it.
















It was cooler outside this evening when we stopped in, but that insulation was already keeping the warmer day temps inside. And this is a temporary thermostat he said.. we have a nicer digital touch screen panel that will be put in at the end. Sweet!